摘要
文章通过对比传统的块段体积计算方法和DTM法体积计算方法,总结了DTM法的科学性和先进性,对今后在非法开采露天矿矿产资源体积计算中的实际应用有着现实的指导意义。
This article compared and summed scientificalness and progressiveness of DTMby conventional bulk vol-ume calculation and DTMvolume calculation two methods,which have the practical significance in application of illegal mining of surface mine of mineral volume calculation from now on.
作者
陆全辉
荆提贤
于水生
LU Quan-hui JING Ti-xian YU Shui-sheng(Geology Surveying and Mapping Institute of Heilongjiang,Harbin Heilongjiang 150030, China Wuhan University,State Key Laboratory of Information Engineering in Surveying,Mapping and Remote Sensing, Wuhan Hubei 430079, China)
出处
《地矿测绘》
2016年第4期33-35,共3页
Surveying and Mapping of Geology and Mineral Resources
关键词
矿产资源
非法开采
体积计算
传统方法
DTM法
mineral resources
illegal mining
volume calculation
conventional method
DTMmethod