摘要
城市轨道交通专用通信系统的部分子系统应在动车调试开始前具备使用条件,经常存在与供电系统同期调试而要使用临时电源的问题,主要分析临时电源调试方案存在的风险和优化措施。
A few subsystems of the private communication system for urban rail transit should have working conditions before train commissioning. There is a phenomenon that a temporary power supply system has to be used when commissioning of both the private communication system and power supply system at the same time. This paper mainly analyzes the risks and optimization solution for temporary power supply commissioning.
出处
《铁路通信信号工程技术》
2016年第6期55-57,共3页
Railway Signalling & Communication Engineering
关键词
专用通信系统
临时电源
调试方案
private communication system
temporary power supply
commissioning solution