文章分析了在巨型桁架两端沉降不均匀的情况下,采用高空散拼及沉降应力消除法,在施工中进行监测,保证了桁架的施工质量,解决了施工技术问题。
It analyzes the application of the high-altitude assembly and sedimentation stress elimination method under uneven sedimentation of mega truss ends. The construction is monitored to guarantee the truss quality, and the construction problem is solved.