建筑工程项目的投资控制贯穿于整个工程建设全过程中,其中主要包含了事前、事中、事后的控制。在建筑工程项目的招投标制度实施下,施工阶段监理制度不断完善及工程结算的全面审核,使得工程造价在事中、事后得到了有效的控制。但是,作为设计阶段的事前造价控制工作,仍未得到有效的实施。论文主要对建筑工程设计阶段如何对工程造价进行有效的控制进行分析,可供相关从业者参考借鉴。
Investment control work construction projects throughout the whole process of project construction,which mainly includes the before,during and after the operation control.Since the implementation of construction projects under the bidding system,the construction phase of the project supervision system for continuous improvement and comprehensive settlement of the audit,so that the project cost in the matter,after has been effectively controlled,but as the cost of pre-design stage of the control work,yet be implemented effectively.This paper focuses on the design phase of construction projects how the project cost effective control for analysis,hoping for a reference for relevant practitioners.
出处
《工程建设与设计》
2017年第1期180-182,共3页
Construction & Design for Engineering
关键词
建筑工程
施工设计
工程造价
控制措施
construction
construction design
project cost
control measures