建筑工程设计与工程造价有效控制分析探讨 被引量:7

Discussion on the Effective Control of Construction Engineering Design and Engineering Cost
下载PDF
导出
摘要 建筑工程项目的投资控制贯穿于整个工程建设全过程中,其中主要包含了事前、事中、事后的控制。在建筑工程项目的招投标制度实施下,施工阶段监理制度不断完善及工程结算的全面审核,使得工程造价在事中、事后得到了有效的控制。但是,作为设计阶段的事前造价控制工作,仍未得到有效的实施。论文主要对建筑工程设计阶段如何对工程造价进行有效的控制进行分析,可供相关从业者参考借鉴。 Investment control work construction projects throughout the whole process of project construction,which mainly includes the before,during and after the operation control.Since the implementation of construction projects under the bidding system,the construction phase of the project supervision system for continuous improvement and comprehensive settlement of the audit,so that the project cost in the matter,after has been effectively controlled,but as the cost of pre-design stage of the control work,yet be implemented effectively.This paper focuses on the design phase of construction projects how the project cost effective control for analysis,hoping for a reference for relevant practitioners.
作者 李旸
出处 《工程建设与设计》 2017年第1期180-182,共3页 Construction & Design for Engineering
关键词 建筑工程 施工设计 工程造价 控制措施 construction construction design project cost control measures
  • 相关文献

参考文献2

共引文献4

同被引文献19

引证文献7

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部