摘要
以张家口—呼和浩特高速铁路东土村隧道下穿京藏高速公路工程为例,从实施方案论证、开挖工法选择、重点及难点分析、主要施工技术应用、监控量测数据分析等几个方面,论述了隧道下穿施工过程中采取的相应对策及技术措施。
Taking an engineering practice as an example, from the implementation of the scheme comparison, the excavation method choice, focus and difficulty analysis, the main construction technology application, monitoring data analysis, this paper discusses the construction of tunnel undercross corresponding countermeasures and technical measures in the process.