对神华榆林循环经济煤炭综合利用项目大保当煤矿主斜井来煤运至化工用煤区的运输方式进行了多方案技术经济比选,最终确定采用表土输煤暗道方案,避开了复杂的地面设施对运输的影响,降低了系统投资。
In Shenhua Yulin circlar economic and coal comprehensive utilization project,the coal need to transport from the main inclined shaft of Dabaodang coal mine to the area of coal chemical industry. By technical and economic comparison of various transport modes,the scheme of coal transportation by surface tunnel was determined,which avoided the impact of complex ground facilities on the transport and reduced the system investment.
出处
《陕西煤炭》
2016年第6期12-15,共4页
Shaanxi Coal
关键词
煤炭综合利用项目
大保当煤矿
输煤方式
探讨
coal comprehensive utilization project
Dabaodang coal mine
coal transportation mode