摘要 结合小龙潭矿务局露天矿排土工艺创新方案实施成果,在1 415 m平台升段至1 440 m平台时,利用912带式输送机在1 440 m平台上建设带式输送机初始平台,充分利用排土机不断往前移动,使带式输送机延长至最大限度长度,实现了一个完整的带式输送机初始平台。为企业节约了运输成本的同时,还实现了上下2个平台交替排土,有效缓解排土压力。 The article combined with dumping process innovative scheme implement results in Xiaolongtan Open-pit Mine, in 1415 platform ascending segment to 1440 platform, using 912 belt conveyor to construct the initial platform of belt conveyor in 1440 platform, and makes full use of dumping machine moving forward to make the belt conveyor extended to the maximum length,which achieves a complete belt conveyor initial platform. The scheme saved the transportation cost for enterprise, realized the two platforms alternating dumping, and effectively relieved the dumping pressure.
出处 《露天采矿技术》 CAS 2016年第11期32-34,共3页 Opencast Mining Technology
关键词 露天矿排土场 升段 带式输送机 初始平台 open-pit mine dump ascending part initial platform of belt conveyor
  • 相关文献

参考文献4

二级参考文献18

  • 1-.露天矿边坡稳定[J].中国矿业大学露天采矿教研室,1984,:3-3.
  • 2陈希哲.土力学地基基础[M].北京:清华大学出版社,1988..
  • 3王礼先.水土保持工程学[M].中国林业出版社,1989..
  • 4孙广忠.中国典型滑坡[M].北京:科学出版社,1998..
  • 5Huang Yang H 包承钢(译).土皮稳定分析[M].北京:清华大学出版社,1988..
  • 6冯国栋.土力学[M].北京:水利电力出版社,1984..
  • 7段喜明.科学栽植林木以最大限度地提高土坡的抗滑性能研究[J].土壤侵蚀与水土保持学报,1998,4(5):48-53.
  • 8陈希哲,土力学地基基础,1988年
  • 9Huang Yang H(译),土坡稳定性分析,1988年
  • 10冯国栋,土力学,1984年

共引文献36

同被引文献11

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部