3Li Y F, Chen S Y. Automatic recalibration of an active structured light vision system [ J ] . IEEE Transactions on Robotics and Automation, 2003, 19 (2) :259 - 268.
4Wu J, Smith J S, Lucas J. Weld bead placement system for multi -pass welding [ J ]. IEEE Proceedings -Science, Measurement & Technology, 1996, 143(2): 85-90.
5Otsu N. A threshold selection method from gray-level his- togram [ J ]. IEEE Trans SMC, 1979,9 ( 1 ) : 62 - 66.
8Wu J,Smith J S,Lucas J. Weld bead placement system for multi-pass welding [ J ]. IEE Proceedings-Science Measurement andTechnology, 1996, 143(2) : 85 -90.
9Kim J S, Son Y T,Cho H S. A robust method for vision-basedseam tracking in robotic arc welding[ C] // Proceedings of TenthInternational Symposium on Intelligent Control, 1995 : 363 -- 368.
10Hyeong S M, Yong B K,Beattie R J. Multi sensor data fusion forimproving performance and reliability of fully automatic weldingsystem[j]. The International Journal of Advanced ManufacturingTechnology, 2006, 28(3 -4) : 286 -293.