摘要
以苍梧站水位台设计及计算过程为例,本着总体布局和结构设计合理、主体安全、牢固的理念,对岛岸结合式水位台测井、基础、进水渠的设计和水位台稳定性、地基承载力的计算进行解析,并给出一般水位台的设计要点,收集现场精准的资料和根据测站级别制定设计标准是做好水位台设计工作的前提。
Taking Wucang station water station as an example, the design and calculation process in line with the reasonable overall layout and structural design, the main body safety and the fastness, analysis and introduction are carried out on the island shore combination water logging, foundation and entrance channel design, also the bearing capacity calculation of parsing. And design points of the water table are presented. At last, the precise site information collection and water level design standards are the premise of design work.
出处
《广东水利水电》
2016年第12期26-29,46,共5页
Guangdong Water Resources and Hydropower
关键词
水位台
设计
计算
water table
design
calculate