摘要 西双版纳电网内发电站均为径流式小水电和新能源电站,无调节能力,随着近年来地区内负荷的增长,枯水期地区小水电出力不足,地区负荷平衡能力差,且受220k V主网断面N-1稳定限制,仅能提供280 MW负荷供应,地区负荷缺口较大。为了缓解地区供电压力,考虑将本地区电网进行拆分后,转由临近地区电网供电,本文主要从负荷平衡、网架结构、电网风险几个方面综合分析,提出较为优化的转供方案。 Xishuangbanna grid power station for small hydropower stations and new energy power station, no ability to regulate, with recent regional load growth and dry region of small hydropower undercapacity, area load balance ability is poor, and 220 kV Main grid interface n-1 stability limit, can only provide 280 MW load supply, regional load gap larger. In order to alleviate the pressure on local supply, considering the local grid is split, the adjacent area power grid, this paper mainly from the load balance, grid structure, grid risk comprehensive analysis proposed a more optimal transfer scheme.
作者 武凤龙
出处 《云南电力技术》 2016年第6期128-130,共3页 Yunnan Electric Power
关键词 运行方式 负载率 风险 电网 Operation mode Load ratio risk power grid
  • 相关文献

参考文献1

二级参考文献3

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部