期刊文献+

水动力模型的地形前处理方法研究--以辽河铁岭段为例

The terrain pretreatment analysis of hydrodynamic model, using Tieling area of Liao River as a case study
下载PDF
导出
摘要 随着科技发展,水利工作走向了数字化时代。使用计算机软件构建数学模型可以方便快捷地对水力情况进行模拟,而研究区地形的提取是构建数学模型的基础。本文介绍了常用的地形前处理方法,并结合实际工作诠释了地形提取的过程。 With the development of science and technology,water conservancy work has stepped into a digital age.Using computer software to build a mathematical model can easily and quickly simulate the hydraulic situation, and the terrain extraction in the study area is the foundation of building a mathematical model.This paper introduces common methods of terrain pretreatment, and explains the process of terrain extraction with examples of real work.This paper can provide some basic theory support for the related water conservancy work.
出处 《吉林水利》 2017年第1期8-11,15,共5页 Jilin Water Resources
关键词 水动力模型 地形前处理 辽河 Hydrodynamic model Terrain pretreatment Liao River
  • 相关文献

参考文献2

二级参考文献9

  • 1北京慧图信息科技有限公司.数字水利解决方案白皮书[Z].,..
  • 2陈俊 宫鹏.实用地理信息系统-成功地理信息系统的建设与管理[M].科学出版社,1999..
  • 3曹祖德,海洋学报,1993年,15卷,1期,108页
  • 4李炎保,港口工程,1992年,1期
  • 5Chen Shengliang,1990年
  • 6曹祖德,交通与计算机,1990年,4卷,75页
  • 7王荣贵,交通与计算机,1990年,3卷,27页
  • 8孙家柄 舒宁 吴泽群.遥感原理、方法和应用[M].北京:测绘出版社,1997.411.
  • 9李纪人.数字地球与数字水利[J].水利水电科技进展,2000,20(1):14-16. 被引量:24

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部