通过对长治瑞达焦化工程现场的勘察,选取了管井降水的方法,并从管井间距、井深、地面排水系统等方面,阐述了降水方案的施工方法,为后期基础工程的施工奠定了基础。
Through the site survey to Changzhi Ruida coking engineering,this paper selected the tubular well precipitation method,and from the tubular well spacing,well depth,surface drainage system and other aspects,elaborated the construction method of precipitation scheme,laid foundation for later foundation engineering construction.