期刊文献+

基坑开挖引起下部地铁隧道变形控制探讨

Discussion on deformation control of underground subway tunnel caused by excavation of foundation pit
下载PDF
导出
摘要 随着我国工程建设的发展以及科学技术的进步,我国的地铁隧道工程建设逐渐开展开来,并在实际的建设过程中推动了我国交通运输的发展,带动了民生事业的进步。但由于现实环境的限制,使得基坑开挖的过程中存在诸多的问题。文章主要探讨了基坑开挖引起下部地铁隧道变形控制。 With the development of China's construction and advancement of science and technology, the subway tunnel construction in our country has gradually developed, and promoted the development of transportation in our country in the actual construction process, stimulated the progress of people's livelihood career. However, due to the reality of the environmental constraints, there are many problems in the process of excavation of foundation pit. In this paper, we mainly discuss the deformation control of underground subway tunnel caused by the excavation of foundation pit.
作者 王新
出处 《江苏科技信息》 2016年第32期56-57,共2页 Jiangsu Science and Technology Information
关键词 基坑开挖 运营隧道 变形研究 模拟计算 foundation pit excavation operation tunnel deformation research simulation calculation
  • 相关文献

参考文献3

二级参考文献22

共引文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部