沙市地区PDC钻头泥包原因分析及对策 被引量:1

Causes Analysis and Solutions of PDC Bit Balling in Shashi District
下载PDF
导出
摘要 PDC钻头泥包是一种严重制约钻井时效的井下复杂情况,主要体现在影响钻头对岩石的切削作用和降低钻井液水动力参数;沙隆达盐矿矿区位于江陵凹陷的中东部,上部地层成岩性差,易发生PDC钻头泥包;通过优化钻井设计、合理调控钻井液性能和强化工程措施可以降低直至消除发生PDC钻头泥包的可能性,此类措施已成功应用于沙隆达盐矿沙市矿区的生产实践。 PDC bit bailing is a kind of underground complicated situation which will seriously restrict the well drilling efficiency. This situation includes affecting the rock cutting action and decreasing the kinetic parameter of drilling fluid. Shaiongda salt mine district is located on the mid-east region of Jiangling sunken, and the upper stratum has bad rock forming condition so the PDC bit bailing can happen easily. After optimizing the well drilling design, reasonable adjusting the properties of drilling fluid and intensifying the construction measures, the possibilities of PDC bit bailing can be decreased until eliminated. This kind of measures have already applied to the current production of Shashi mine district in Shalongda salt mine district.
出处 《中国井矿盐》 CAS 2017年第1期24-26,共3页 China Well and Rock Salt
关键词 PDC钻头 泥包 钻井液性能 工程措施 PDC bit, bit bailing, properties of drilling fluid, engineering measures
  • 相关文献

参考文献1

二级参考文献2

  • 1黄汉仁.泥浆工艺原理[M].北京:石油工业出版社,1984..
  • 2塔里木石油勘探开发指挥部.钻井监督指南[M].北京:石油工业出版社,1999..

共引文献27

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部