摘要
城市交通拥堵是全国各大城市的"通病",要缓解我国城市交通拥堵问题,需要进一步加强城市市政基础设施建设。而轨道交通、城市高架等重大市政基础设施的建设周期都比较长,若组织不好施工期间的交通组织,则进一步加剧城市交通拥堵,严重的影响城市居民的生产和生活。以青岛海湾大桥接线工程施工期间交通组织为例,阐述城市重大市政基础设施施工期间交通组织所采用的方法和措施,可为城市重大市政基础设施施工调流积累经验、提供参考。
The urban traffic congestion is the common failing in every big city of China.The urban traffic congestion problem is required to solve in China.It is necessary further to strength the construction of urban municipal infrastructure.The construction period of the important municipal infrastructure,i.e.rail transit and urban viaduct is longer.If poor traffic organization during construction,it will further intensify the urban traffic congestion and seriously affect the production and living of the urban residents.Taking the traffic organization in the construction of Qingdao Haiwan Bridge Connection Project as an example,the article sets forth the method and measures taken for the traffic organization during the construction of urban important municipal infrastructure,which can provide the experience and reference for the flow adjustment in the construction of similar urban important municipal infrastructures.
出处
《城市道桥与防洪》
2017年第1期22-25,共4页
Urban Roads Bridges & Flood Control
关键词
交通拥堵
重大市政设施建设
调流交通分析
施工期间交通组织
traffic congestion
construction of important municipal infrastructure
analysis of traffic flow adjustment
traffic organization during construction