期刊文献+

市政工程中磁悬浮保护方案初步探讨与分析

Preliminary Discussion and Analysis of Magnetic Levitation Protection Scheme in Municipal Engineering
下载PDF
导出
摘要 上海磁悬浮专线是世界上第一条真正投入商业运营的高速磁悬浮,近年来,随着市政工程的建设发展,多处市政工程在实施过程中与磁浮设施发生矛盾,对相关的磁浮设施采取合理的保护措施,确保市政项目的正常实施以及磁浮运营的安全至关重要。依托上海凌空路-迎宾大道立交改建工程,初步探讨工程中几种常用的磁浮保护方案,得出适用于项目特点的针对性的保护方案,并进行相应的验算和评估,可为同类工程提供借鉴。 The maglev line of Shanghai is the first high-speed maglev line really putinto commercial operationin the world.In the recent years with the construction development of municipal engineering many municipal engineering projects conflict with the magnetic levitation facilities in the implementation process It is very important to take the reasonable protection measures for the relative magnetic levitation facilities in order to ensure the normal implementation of municipal projects and the safety of magnetic levitation operation.According to Shanghai Lingkong Road-Yingbin Avenue Interchange Reconstruction Project;the article preliminarily discusses some common magnetic levitation protection schemes for the project;gives the targeted protection scheme suitable for the characteristics of the project,and i ntroduces the relative checki ng calculation and esti mation,which can be referred for the similar projects
作者 王文娟
出处 《城市道桥与防洪》 2017年第1期158-160,174,共4页 Urban Roads Bridges & Flood Control
关键词 市政工程 磁悬浮 电缆沟 保护方案 评估 municipal engineering magnetic levitation cable trench protection scheme estimation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部