摘要
本文针对大断面煤矿巷道快速掘进,在保障作业安全性的基础上,通过评价干扰掘进进度的各项原因,针对影响进度的关键要素逐一进行解决,以保证采掘接续作业能够顺利进行。
Aiming at the large section coal roadway rapid excavation technology, based on ensuring the safety of mining operations, the interference factors of mining progress were evaluated to ensure that the mining operation can be carried out smoothly.
出处
《山东煤炭科技》
2017年第1期72-74,共3页
Shandong Coal Science and Technology
关键词
大断面
快速
掘进
数值模拟
large section
rapid
excavation
numerical simulation