摘要 排土场失稳破坏将产生重大的灾难性后果。由于排土场的特殊性,其失稳变形破坏机制更为复杂。以福建某露天矿排土场为原型,用颗粒流软件PFC2D对其进行饱和工况下的变形破坏过程模拟,根据坡形变化图、位移矢量图以及测量圈的孔隙率监测数据探究排土场的破坏机制,总结排土场变形破坏规律。结果表明,上部堆积体最先产生滑移,对下部产生堆挤,使得坡脚隆起、细颗粒挤出,最终导致整体性滑移;于基岩面附近产生沿基岩面的折线滑动,越靠近临空面则逐渐演化为圆弧滑动;变形过程中,孔隙率变化可分为两类:Ⅰ类孔隙率由大变小,Ⅱ类由小变大,两者在坡体破坏之时孔隙率增长速度接近。研究结果对排土场边坡的稳定分析具有理论和实际意义。 The failure of waste dump slope will cause results. Due to the particularity of waste-dump slope, its failure mechanism becomes more complex. Taking a waste-dump slope in Fujian as an object, we simulate the deformation and failure process of the slope by PFC-2D under saturated condition. The failure mechanism and law of the waste-dump slope have been concluded according to the slope shape variation, displacement vector graph as well as the monitoring data of porosity comes from measuring circle. The simulation results show that: the upper accumulated body slides firstly, then it squeezes the bottom part so that the slope toe bulges and fine particles are squeezed out, finally, the whole slope generate slip. Near the bedrock, the slope generate a fold line slide along the bedrock surface, but the sliding surface would gradually evolve into the arc-shaped when it is closer to the free surface. During the deformation, the change of porosity can be divided into two classes, Ⅰ is decreasing, Ⅱ is increasing, and they came to a approximate growth rate when the slope is destroyed. The results provide theoretical and practical reference to stability analysis of waste-dump slope.
出处 《有色金属(矿山部分)》 2017年第1期83-87,97,共6页 NONFERROUS METALS(Mining Section)
基金 福建省自然科学基金项目(2015J01164)
关键词 排土场边坡 颗粒流软件 测量圈 位移矢量 孔隙特性 waste-dump slope PFC-2D measuring circle displacement vector porosity character
  • 相关文献

参考文献3

二级参考文献25

  • 1胡婷.自然斜坡稳定坡角的统计分析与工程应用[J].四川建筑,2009,39(6):86-87. 被引量:1
  • 2马公望.金堆城露天矿排土场稳定性分析[J].金属矿山,2004,33(8):32-34. 被引量:13
  • 3穆大耀,王勋业.露天排土场边坡稳定性模拟试验与分析[J].昆明工学院学报,1994,19(1):12-18. 被引量:7
  • 4黄礼富 苏文贤.高台阶排土场岩石块度分布规律研究[J].有色矿山,1988,(9):7-13.
  • 5ITASCA Consulting Group.PFC2D(Particle Flow Code in 2 Dimensions) Theory and Background[M].USA:Itasca Consulting Group,Minneapolis,Minnesota 55401,2002.
  • 6ITASCA Consulting Group.PFC2D(Particle Flow Code in 2 Dimensions) User's Guide[M].USA:Itasca Consulting Group,Minneapolis,Minnesota 55401,2002.
  • 7冶金都马鞍山矿山研究院.永平铜矿排土场泥石流成因及其预测研究报告[R].马鞍山:冶金部马鞍山矿山研究院,1987.
  • 8冶金部马鞍山矿山研究院,攀枝花矿山公司朱家包铁矿.高台阶排土场稳定性及监测技术的研究[R].马鞍山:冶金部马鞍山矿山研究院,1990.
  • 9中钢集团马鞍山矿山研究,等,永平铜矿西部排土场安全稳定性研究及治理方案[R].马鞍山:中钢集团马鞍山矿山研究院,2007.
  • 10黄敏,李夕兵,付玉华,李地元.某矿山排土场边坡稳定性分析[J].矿冶工程,2007,27(5):12-14. 被引量:29

共引文献13

同被引文献16

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部