牛山污水厂CASS工艺的改造

Transforming the CASS Process of Niushan Sewage Factory
下载PDF
导出
摘要 牛山污水厂采用周期为4 h的CASS处理工艺处理城镇污水,但出水水质不稳定。当进水浓度较低时,出水达到国家《城镇污水处理厂污染物排放标准》(GB18918-2002)一级B标准。进水浓度中等以上时,出水总磷和氨氮有时会超标。因此,对该厂进行CASS工艺改造,使其出水稳定达标排放。 The period that the waste water is treated by the CASS process is 4 hours in Niushan urban sewage. But the effluent water quality is not stable. The effluent from CASS process can meet the national "urban sewage treatment plant pollutant discharge standard" (GB18918 -2002) standard of level 1 B, when water concentration is low. When water concentration is medium above, the total phosphorus and ammonia nitrogen from the effluent water sometimes exceed the national "urban sewage treatment plant pollutant discharge standard" (GB18918 -2002) standard of level 1 B. So we should transform the CASS process that the water treated period is 4 hours to make the effluent water stably meet the national standard.
作者 刘惠成 Liu Huicheng(East City Niushan Wastewater Treated Service Co. , Ltd. in Dongguan City, Dongguan 523128,China)
出处 《山东化工》 CAS 2017年第1期145-148,共4页 Shandong Chemical Industry
关键词 CASS 改造 生活污水 CASS transforming sewage
  • 相关文献

参考文献3

二级参考文献8

共引文献75

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部