摘要
主要分析了新庄煤矿的地下水的补给来源、补给途径,并采用大井法预测了井田正常涌水量和最大涌水量,预算结果较为准确,为井田的下一步生产提供技术支持。
This paper mainly analyzed the supply source and supply Ways of groundwater of Xinzhuang Coal Mine, and predicted the normal water inflow and the maximum water inflow of well field by the big well method, the budget result of which was relatively accurate, providing technical support for further production of well field.
作者
赵媛
ZHAO Yuan(Coal Resources Geological Bureau, Shanxi Province Coal Industry Office, Taiyuan 030045, Shanxi, Chin)
出处
《能源与节能》
2017年第1期34-35,41,共3页
Energy and Energy Conservation
关键词
水文地质条件
带压开采分区
充水因素分析
涌水量预测
hydrogeology conditions
mining division under pressure
water filling factors analysis
water inflow forecast