黑龙水电站降雨量高程修正对径流影响分析 被引量:1

Effect of precipitation elevation correction on streamflow of Heilong hydropower station
下载PDF
导出
摘要 采用泰森多边形法及数字高程修正两种方法对云南省小黑江流域黑龙水电站面降雨量进行分析,分析对径流的影响。结果表明,相对于采用传统泰森多边形法,采用数字高程栅格数据计算的黑龙水电站坝址以上平均高程和流域面雨量均有不同程度增加,而设计流域和参证流域的径流系数均有一定程度的减小,设计流域的平均流量会有所增加但增幅不大。 The traditional Thiessen polygon method and DEM correction were adapted to study the nopoint precipitation and the effect on streamflow of Heilong hydropower station, located in Xiaohei river basin of Yunnan province. Compared with the traditional Thiessen polygon method, the mean elevation and precipitation over the Heilong hydropower basin increased by different degree based on the DEM data. However, the runoff coefficient of the design and reference watershed reduced and the mean discharge of design basin increased slightly.
作者 黄靖 张磊磊
出处 《大坝与安全》 2016年第5期32-35,共4页 Dam & Safety
关键词 降雨量 高程 DEM 径流 黑龙水电站 precipitation elevation DEM streamflow Heilong hydropower station
  • 相关文献

同被引文献10

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部