摘要
结合天津港北疆港区21~#泊位码头结构加固改造工程,提出了码头前沿局部补桩后新建靠船构件改造技术,投资少,工期短。
Based on the design for updating Berth 21 in Beijiang Harbor of Tianjin Port, a new structure is proposed that consists of additional bracing piles in the front of the berth structure and new type of berthing members, which are cost- effective and time saving in construction.
出处
《港工技术》
2016年第B12期44-47,共4页
Port Engineering Technology
关键词
老码头
结构改造
新建靠船构件
岸坡稳定
船舶荷载
old berth
structure renovation
new type of berthing members
bank stability
ship actions