期刊文献+

杨村煤矿综放工作面过断层技术与管理实践 被引量:3

The Technology and Management Practice of Fully Mechanized Caving Face Crossing Over Fault in Yangcun Coal Mine
下载PDF
导出
摘要 针对杨村煤矿321综放工作面的实际地质情况,通过比较综放工作面过断层技术方案,最终采取刹刀破底的方法顺利通过了断层,减少了煤炭储量损失,节省了工作面搬家费用,提高了煤炭回收率,增加了矿井效益,实现了综放工作面的安全高效生产。本文还结合基层单位现场管理实际,介绍了综放工作面过断层期间的安全技术管理,对其它相似工作面过断层提供了参考借鉴。 For the practical geological condition of 321 st fully mechanized caving face of Yangcun coal mine,by compare the technical proposalof fully mechanized caving face crossing over fault,finally take the method of braking to break the bottom to cross over fault smoothly,which cutloss of coal reserves,save the expense of moving working face,improve the recovery rate of coal ,increase the mine benefit and realize the safeand effective produce of fully mechanized caving face.This thesis also combine the practice management of grassroots units,introduce the safetechnology management during the crossing over fault period,which offer referent to the other similar solution
出处 《煤矿现代化》 2017年第1期19-21,共3页 Coal Mine Modernization
关键词 综放工作面 过断层技术 安全管理 顶板支护 煤质管理 fully mechanized caving face,technology of crossing over fault,safe management,roof support,management of coal mine
  • 相关文献

参考文献5

二级参考文献49

共引文献135

同被引文献12

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部