期刊文献+

基于沥青废料复合改性的新型磷石膏水泥缓凝剂研究 被引量:4

Research on the novel phosphogypsum cement retarder based on the asphalt waste composite modifier
下载PDF
导出
摘要 循环利用沥青工业废料对磷石膏进行复合改性,以用作新型低成本水泥缓凝剂。主要探索改性处理工艺对水泥凝结时间的影响规律,结果表明:改性磷石膏水泥的初凝时间为250 min,终凝时间为295 min,改性处理可有效缩短磷石膏水泥凝结时间,可望替代价格较高的传统天然石膏水泥缓凝剂,并在水泥工业中推广应用。 The industrial asphalt waste is employed to modify the property of phosphor-gypsum using as the novel and lowcost cement retarder. The influence of modified treatment technology on the cement setting time is mainly explored in this work. The experimental results indicate that initial setting time of modified phosphogypsum cement is 250 min,and the final setting time is 295 min. The treatment could effectively reduce the cement setting time,which is promising to substitute the traditional nature gypsum cement retarder and applied in the cement industry.
出处 《新型建筑材料》 北大核心 2017年第1期40-42,103,共4页 New Building Materials
基金 国家自然科学基金项目(51302058 U1532140) 安徽省自然科学基金项目(JZ2015AKZR0031) 合肥工业大学应用培育计划项目(JZ2016YYPY0036)
关键词 磷石膏 沥青工业废料 复合改性 水泥缓凝剂 凝结时间 phosphogypsum, industrial asphalt waste, composite modification, cement retarder, setting time
  • 相关文献

参考文献12

二级参考文献98

共引文献127

同被引文献31

引证文献4

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部