摘要
以重庆市轨道交通环线二期工程海棠溪高架车站为例,分析城市轨道交通高架车站工程主体结构的温度应力情况及开裂原因,提出温度应力场的仿真计算与温控防裂的措施,为城市轨道交通高架车站的同类问题提供科学的参考依据。
The elevated station in the second phase project of Chongqing rail transit link Begonia River, for example, temperature analysis of the urban rail transit viaduct station project main structure should situation and the causes of cracking, temperature and stress field simulation calculation, temperature control and crack prevention measures are put forward, providing scientific reference for the similar problem of urban elevated rail transit station is put forward.
出处
《建筑技术开发》
2016年第12期58-59,共2页
Building Technology Development
关键词
高架车站
温度应力仿真
温控防裂措施
elevated station
temperature stress simulation
temperature control measures