摘要
本文在介绍光伏组件监造工作内容的基础上,结合安徽颍上县焦岗湖60MW光伏发电项目组件设备的监造实践经验,对组件监造过程中的关键点及问题处理进行了探讨分析,旨在提高组件设备监造质量,为组织监造工作提出更科学、更具可操作性的意见。
This paper introduces the content of the PV modules supervision.Based on the experience of supervising the 60 MW photovoltaic power generation projects in AnHui Province,the author analyzes and discusses the main concerns and problem treatment in the process of PV modules supervision.For better PV modules supervision,more rational and workable suggestions are provided in this article.
出处
《设备监理》
2017年第1期60-62,共3页
Plant Engineering Consultants
关键词
光伏组件
监理
PV modules
supervision