摘要
对电厂2×330 MW汽轮机组调试过程中汽轮机惰走时间发生异常,对由此引出的问题进行了详细的介绍,并就问题的分析、处理方法进行了阐述。
Based on commissioning and test-operating two 330 MW steam turbine from ** Power Plant,this article tries to introduce,analyze and solve the problems of jacking oil system which is found out during the turbine units' test-run and concludes some lessons and experience.
作者
张瑞山
ZHANG Rui - shah(STATE GRID Gansu Electric Power Research Institute, Lanzhou 730050, Chin)
出处
《应用能源技术》
2016年第12期15-17,共3页
Applied Energy Technology
关键词
汽轮机组
惰走时间
异常
处理
Steam turbine
Jacking oil system
Commissioning
Solution