期刊文献+

CNG常规加气站主要工艺设备容量的匹配 被引量:1

Determination of Main Process Equipment Capacity of Conventional CNG Refueling Station
下载PDF
导出
摘要 结合河南地区部分加气站设备配置的实际,对设计能力2.0万m^3/d的常规加气站主要工艺设备容量的匹配情况及存在问题进行了统计分析,根据工程建设和运行经验,结合理论计算,确定了常规加气站主要设备加气机、压缩机和储气设施容量匹配的原则、方法及建议。 Combining the actual situation of equipments in some gas stations in Henan province,the capacity matching situation of main equipments and existing problems in conventional CNG refueling station with a common design capacity of 20 000 m3 / d are analyzed. According to the project construction and operation experience,combined with the theoretical calculation,the matching principle,methods and suggestions for the determination of main equipments in conventional CNG refueling station are proposed to provide a reference for related gas refueling stations to determine the matching capacity of equipments.
出处 《石油库与加油站》 2016年第6期9-13,共5页 Oil Depot And Gas Station
关键词 CNG 加气站 主要设备 容量 匹配 探讨 CNG refueling station main equipment capacity matching determination discussion
  • 相关文献

参考文献2

二级参考文献3

共引文献10

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部