摘要 为探究提高尾矿库稳定性措施的有效性,以阜新阿哈来铁尾矿库为例开展物理模拟研究,分别对比初期坝为土石坝和透水坝时尾矿库浸润线的变化,加设筋带与未加设筋带坝体的失稳过程差异。结果表明,各种库水位条件下,透水初期坝使尾矿库浸润线显著降低,尾矿库失稳时,首先在底部坡面出现裂纹并向内部和上部发展,之后在初始裂纹上部依次产生裂纹并扩展,直至整体失稳,加设筋带时裂纹发展间距小,滑裂带位置浅,失稳过程缓慢,滑裂带尾矿滑经筋带时速度减慢并滚动,滑坡体的整体动能显著减小。 For the sake of researching effectiveness of the measures to improve the tailings pond stability, taking Fuxin Ahalai iron tailings pond as an example, physical simulation experiments were carried out. Change in saturation line was observed for an earth-rock dam and a permeable dam both as a starter dam. Difference in instability process was examined between two dams one of which was reinforced. The results show that: for all water levels, the permeable starter dam makes the saturation line obviously decrease, when the tailings pond is losing instability, first crack appears at the bottom of slope surface and develops to internal and upper of dam body, then on the top of the initial crack produces crack successively and expand, until the whole instability, when the reinforcement strip is setted, crack development spacing becomes small, the position of slip crack belt shallow, instability process slow and that tailings in slip crack belts slides through reinforcement strip and the speed is slower, the overall kinetic energy of the landslide is significantly decreased.
出处 《中国安全科学学报》 CAS CSCD 北大核心 2016年第12期86-91,共6页 China Safety Science Journal
基金 国家自然科学基金资助(50974070 51474120)
关键词 尾矿库 物理模拟 透水初期坝 浸润线 筋带 滑裂带 tailings pond physical simulation permeable starter dam saturation line reinforcement strip slip crack belt
  • 相关文献

参考文献11

二级参考文献141

共引文献297

同被引文献22

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部