期刊文献+

大型风电机组机组层AGC控制策略研究 被引量:20

Research on automatic generation turbine control strategy of large wind turbine
下载PDF
导出
摘要 针对传统控制策略下的风电机组输出波动性大、随机性强,需其他设备协调风电场出力的缺点,提出一种机组层WT-AGC控制策略,并对该控制策略的工作原理进行了详细的分析。在考虑风电机组运行状态及风电场调度要求的基础上,将WT-AGC策略下机组运行方式分为2种:调度指令高于机组最大出力能力的常规运行和调度指令低于机组最大出力能力的限功率运行。通过风电机组转速调节和变桨距机构动作配合,实现风电机组输出稳定,满足风电场调度要求,并对某实际双馈风电机组进行了仿真。结果表明该控制策略不但可以实现风电机组的可调度输出,而且提高风电机组并网后的功率稳定性,验证了所提策略的正确性。 Wind turbine output has characters of large volatility and strong randomness,and needs other equipment to coordinate under the traditional control strategies.The paper proposes and analyzes the working principle of a unit layer WT-AGC control strategy in detail.Considering operating state of wind turbine and requirements of wind farms,unit operating modes are divided into two ones under WT-AGC control strategy,which include the traditional operation of order higher than the maximum capacity and limited power operation of order below the maximum capacity of the unit.Through controlling the rotating speed of wind turbine and pitch-regulated mechanism,the steady output of wind turbine is achieved to meet the scheduling requirements of wind farms,which has been simulated by a real double-fed wind turbine.The results show the WT-AGC control strategy not only achieves output scheduleability of wind turbine,but also improves stability of wind power integration,which verify the validity of proposed strategy.
出处 《电力系统保护与控制》 EI CSCD 北大核心 2017年第2期69-74,共6页 Power System Protection and Control
基金 中丹国际科技合作专项项目(2014DFG62530) 国网南瑞科技项目(SGTYHT/14-JS-188) 南通市科技项目(BK 2014028)~~
关键词 机组层WT-AGC 转速控制 桨距角控制 输出稳定性 unit layer WT-AGC rotational speed control pitch angle control output schedulability
  • 相关文献

参考文献6

二级参考文献89

  • 1侯云鹤,鲁丽娟,熊信艮,程时杰,吴耀武.改进粒子群算法及其在电力系统经济负荷分配中的应用[J].中国电机工程学报,2004,24(7):95-100. 被引量:157
  • 2周双喜,王海超,陈寿孙.风力发电运行价值分析[J].电网技术,2006,30(14):98-102. 被引量:59
  • 3BALDICK R. The generalized unit commitment problem[J].IEEE Trans on Power Systems, 1995, 10(1): 465-475.
  • 4BATH R, BRAND H, MEIBOM P, et al. A stochastic unitcommitment model for the evaluation of the impacts of the integration of large amounts of wind power[C]// Proceedings of the 9th International Conference on Probabilistic Methods Applied to Power Systems, June 11-15, 2006, Stockholm, Sweden: 8p.
  • 5TUOHY A, MEIBOM P, OMALI.EY M. Benefits of stochastic scheduling for power system with significant installed wind power[C]// Proceedings of the 10th International Conference on Probabilistic Methods Applied to Power Systems, May 25-29, 2008, Mayagtlez, Puerto Rieo: 7p.
  • 6TUOHY A, MEIBOM P, DENNY E, et al. Unit commitment for systems with significant wind penetration[J]. IEEE Trans on Power Systems, 2009, 24(2) : 592-601.
  • 7RUIZ P A, PHILBRICK C R, SAUER P W. Wind power day ahead uncertainty management through stochastic unit commitment policies[C]// Proceedings of Power Systems Conference and Exhibition, March 15-18, 2009, Seattle, WA, USA: 9p.
  • 8WANG Jianhui, SHAHIDEHPOUR M, LI Zuyi. Security constraint unit commitment with volatile wind power generation [J]. IEEETransonPowerSystems, 2008, 23(3): 1319-1327.
  • 9WANG Jianhui, BOTTERUD A, MIRANDA V, et al. Impact of wind power forecasting on unit commitment and dispatch [C]// Proceedings of the 8th International Workshop on Largescale Integration of Wind Power into Power Systems, October 14 15, 2009, Bremen, Germany.
  • 10PINSON P. Estimation of the uncertainty in wind power forecasting[D]. Paris, France: Ecole des Mines de Paris, 2006.

共引文献173

同被引文献213

引证文献20

二级引证文献121

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部