期刊文献+

锦屏一级电站10kV备自投应用方案研究及改进 被引量:3

Study on application scheme of 10kV backup automatic switch in Jinping Ⅰ Hydropower Station and improvement
下载PDF
导出
摘要 当水电站厂用电母线主供电源失电时,备自投装置应能正确动作,以保证主设备的稳定运行。对锦屏一级水电站的10 k V备自投装置的设计方案及其优化措施作了简单介绍。锦屏一级水电站10 k V备自投装置设计时重点对动作逻辑的合理性、闭锁的可靠性以及大容量负荷的特殊性等方面开展了分析研究,考虑到可能会出现的问题,制定出了相应的有效措施以保证厂用电在特殊工况下失电时,备自投装置均能正确动作。 When the main power supply for service power busbar of hydropower station blacks out,the backup automatic switch is expected to be activated to ensure the stable operation of the primary equipment. The paper introduces the design scheme and optimization measures of 10 kV backup automatic switch device of Jinping Ⅰ Hydropower Station in brief. In device design stage,we focused on the analysis and study of the activation logical rationality,interlock reliability,and the distinctiveness under bulk capacity load. In consideration of possible problems,related effective measures are devised to ensure the correct activation of the backup automatic switch device in case of a blackout of the service power under special working conditions.
出处 《人民长江》 北大核心 2017年第2期20-23,共4页 Yangtze River
关键词 备自投装置 动作逻辑 备自投装置闭锁 锦屏一级水电站 backup automatic switch activation logic backup automatic switch interlock Jinping Ⅰ Hydropower Station
  • 相关文献

参考文献2

二级参考文献10

共引文献42

同被引文献37

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部