大跨连体钢桁架整体提升施工技术 被引量:17

CONSTRUCTION TECHNIQUE FOR INTEGRAL LIFTING OF WIDE-SPAN CONNECTED STEEL TRUSS
下载PDF
导出
摘要 南京六合金融大厦连体钢桁架跨度32 m,总重约300 t,为缩短工期、降低成本,工程按"地面拼装、整体提升"的思路,采用液压整体提升施工技术安装连体钢桁架。通过将钢桁架整体提升部分长度,对桁架端部进行整体加固处理;分析在提升点间存在不同步的情况下,桁架应力与位移的变化情况;总结5个同步性控制措施的方法,分别解决了在正式提升时桁架总重过大而引起的界面承载力过大,提升过程中桁架挠度过大与人工控制时提升点间不同步的难题。实践表明,整体提升施工技术安全、经济、高效,是同类结构施工的理想方法。 The connected steel truss of Nanjing Liuhe Financial Building has a span of 32m and a gross weight of nearly 300t. To shorten the construction period and reduce construction cost, integral hydraulic lifting technique was adopted to install the connected steel truss based on the concept of "ground assembly and integral lifting" The steel truss was lifted as a whole upto a certain length, the truss ends were strengthened; variation of truss stress and displacement was analyzed with consideration of the nonsynchronous conditions among lifting points; five synchronization control measures were proposed to solve various lifting difficulties, such as by huge gross weight of truss during lifting and under manual control. It was proved that integral structure construction due to its safe, economic and
作者 刘家彬 郭正兴 夏虎 LIU Jia-bin GUO Zheng-xing XlA Hu(School of Civil Engineering, Southeast University, 210096, Nanjing, China)
出处 《建筑技术》 北大核心 2017年第2期126-129,共4页 Architecture Technology
关键词 整体提升 连体钢桁架 同步控制 integral lifting connected steel truss excessive interface load and truss deflection caused nonsynchronous phenomenon among lifting points lifting technique was an ideal method for similar effective characteristics. synchronization control
  • 相关文献

参考文献1

二级参考文献3

共引文献4

同被引文献48

引证文献17

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部