摘要
建设工程项目管理包括从项目立项的决策阶段、实施阶段、运营阶段的全寿命周期的管理,其内涵是:自项目开始至项目完成,通过项目策划和项目控制,使各项目标(成本、质量、安全、进度等)得以实现。论文主要介绍针对市政管道(给排水、采暖、燃气)工程在项目实施阶段即施工阶段的质量、安全、进度目标进行管理控制的措施和方法。
The constructionproj ectmanagementincludethemanagementofproj ect decision-makingstage.implementation stage andoperation stage, it means that from the project starting to its complete, make each target (cost. quality, safety and schedule) can be realized by planning and controlling the project. This paper mainly introduce the quality 、 safety and schedule management control measures and methods in construction, whichis theproj ect implementation stage o fmunieipalpipeline (water supply and drainage, heating and gas ) engineering.
作者
肖华
XIAO Hua(Xishan Coal and Electricity Group Public Service Branch Project Management Station, Taiyuan 030000, Chin)
出处
《工程建设与设计》
2017年第2期66-67,共2页
Construction & Design for Engineering
关键词
市政管道工程
质量
安全
目标管理
municipal pipeline engineering
quality
safety
target management