海底隧道的施工受到多方面自然因素的影响,对于超大断面海底隧道穿越风化槽来说,施工技术和方案都要根据不同的地质及围岩情况进行研究。论文以厦门第二西通道(海沧海底隧道)F6风化槽为例,对不同地质情况采用的施工方案进行研究。
The construction of subsea tunnel has been affected by many aspects of nature, for the undersea tunnel through the weathered trough construction technology and scheme are studied according to the different situation.This paper take the Xiamen No2 west gallery (Haicang subsea tunnel ) F6 weathered trough as a example, study on the construction schemes in different geological situation.
作者
曹明杰
CAO Ming-jie(China Railway 18 Bureau Group Co. Ltd., First engineering company, Zhuozhou 072750 ,China)
出处
《工程建设与设计》
2017年第2期111-112,共2页
Construction & Design for Engineering
关键词
大断面
海底隧道
风化槽
施工方案
large cross section
subsea tunnel
weathered trough
construction scheme