Case Study: Public Transport Management System for KousbamChekka Roadway
Case Study: Public Transport Management System for KousbamChekka Roadway
Public transport, bus system, Lebanon, traffic congestion.
-
1认证(英文)[J].China Standardization,2012,57(3):6-6.
-
2柳琳琳,李一叶,邓飞飞,陈军.南昌地铁1号线网络控制与诊断系统[J].机车电传动,2017(1):98-101. 被引量:1
-
3晏启鹏.Analysis and Simulation of Acceptance Gap Control System for Complicated Entrance Ramp on HighClass Roadway[J].Journal of Modern Transportation,1999,16(2):133-140.
-
4蔡康旭,郭达.Influencing factors of infrared surveying in roadway[J].Journal of Coal Science & Engineering(China),2006,12(1):49-51.
-
5杨玲,王敬途.YRCW中国攻略[J].运输经理世界,2006(2):70-71.
-
6Meng Bo,Jing Hongwen,Chen Kunfu,Su Haijian.Failure mechanism and stability control of a large section of very soft roadway surrounding rock shear slip[J].International Journal of Mining Science and Technology,2013,23(1):127-134. 被引量:22
-
7任远,黄侨,孙永明.Research development of digital maintenance and management system for long-span cable-stayed bridges[J].Journal of Harbin Institute of Technology(New Series),2009,16(1):96-100.
-
8曾胜,徐琦.路面性能数据库系统开发探讨[J].中外公路,2004,24(3):33-36.
-
9陈锌.AMS分段精度管理方法的开发与应用[J].广东造船,2012,31(3):67-70.
-
10Fan Yu,Jilin Qi,Xiaoliang Yao.Analysis on the Settlement of Roadway Embankments in Permafrost Regions[J].Journal of Earth Science,2014,25(4):764-770. 被引量:3