生米九龙湖1号水利工程双层地基更换砂垫层设计研究

Study on Designing of Sand cushion Replaced in Double-layered Foundation of Shengmi Jiulong Lake No. 1 Water Conservancy Project
下载PDF
导出
摘要 江西省生米九龙湖1号水利工程为典型的双层地基,但存在着严重的承载力不足和渗透性较差的问题,同时由于前期勘测结果不准确,导致了工程需要重新设计,施工难度大。采用更换砂垫层处理方法,解决了地基承载力不足的问题以及渗透性不足的问题,投资增加不大,施工之时亦十分方便,可以为类似工程提供借鉴。 Shengmi Jiulong Lake No. 1 Water Conservancy Project is a classical project with double-layered foundation but it is beset by seriously insufficient bearing capacity and inferior permeability. In the meantime,due to inaccurate surveying results in the incipient period,the project needs re-designing and hence construction difficulty is intense. Use of the disposal method of replaced sand cushion helps resolve insufficient bearing capacity of foundation soil and deficient permeability with low added input. It is quite handy during construction and can provide reference to analogous projects.
作者 王登伟 WANG Dengwei(Jiangxi Water Conservancy Hydropower Development Co., Ltd., Nanchang 330000, Chin)
出处 《中国水能及电气化》 2016年第12期64-67,共4页 China Water Power & Electrification
关键词 双层地基 砂垫层 基础处理 排水降压 double-layered foundation sand cushion foundation treatment drainage and depressurization
  • 相关文献

参考文献9

二级参考文献67

共引文献58

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部