期刊文献+

污水处理PPP项目价格形成与动态调整机制研究 被引量:26

Research on price formation and dynamic adjustment mechanism of sewage treatment PPP project
原文传递
导出
摘要 污水处理项目采用PPP模式,通常签订具有较高风险的长期合同。而此类项目通常签订具有较高风险的长期合同。因此,合理定价及建立价格动态调整机制,成为提高政企合作效率和稳定合作关系的关键因素。本文基于项目现金流量和社会资本预期收益率确定的N PV模型,提出了价格动态调整的触发机制和方法,并以王小郢污水处理PPP项目为实例进行验证,对应用本模型计算的结果与该项目实际运营情况的误差进行分析。结果表明:N PV模型能够维持合理的社会资本回报率,对风险分担有合理的掌控方法,对价格的动态调整具有指导性意义。 The sewage treatment project adopts PPP mode, and the project usually with a higher risk of long-term contracts. Therefore, reasonable pricing and the establishment of a dynamic price adjustment mechanism are the key factors to improve the efficiency of government-enterprise cooperation and stability. Based on the NPV model of project cash flow and expected returns of social capital, this paper proposes the triggering mechanism and method of price dynamic adjustment, and the wastewater treatment project of Wang Xiaoying was used as an example to verify the results. The error of the calculation result of this model and the actual operation of the project was analyzed. The results show that the PPP project pricing can main- tain a reasonable returns on social capital and have a rational control over risk sharing, which is of guiding significance for dynamic price adjustment.
出处 《价格理论与实践》 CSSCI 北大核心 2016年第11期130-133,共4页 Price:Theory & Practice
基金 国家自然科学基金资助项目(71471131) 天津理工大学校级科技项目(BIM技术在绿色施工中的应用研究)
关键词 污水处理项目 PPP项目定价 NPV模型 价格动态调整 Sewage treatment project PPP project pricing NPV model Price dynamic adjustment
  • 相关文献

参考文献6

二级参考文献48

  • 1孙斌,邹国平,穆文奇,俞礼军.交通投资项目效益分析方法及应用[J].中外公路,2010,30(5):325-328. 被引量:2
  • 2刘小宁,张洪政,李庆祥,朱燕君.我国大雾的气候特征及变化初步解释[J].应用气象学报,2005,16(2):220-230. 被引量:274
  • 3何寿奎,傅鸿源.基于风险分摊的PPP项目投资决策与收益分配研究[J].建筑经济,2006,27(10):9-12. 被引量:33
  • 4李睿祎.德鲁克目标管理体系初探[J].北华大学学报(社会科学版),2007,8(2):21-24. 被引量:23
  • 5Li B, Akintoye A, Edwards P J, Hardcastle C. Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI procurement for construction projects in the UK: Findings from a questionnaire survey [J]. Engineering, Construction and Architecture Management, 2005, 12 ( 2 ) : 125-148.
  • 6汪文雄.公私营合作(PPP)基础设施项目产品定价模型研究[D].东南大学博士学位论文,2008.
  • 7Ahmed M, Abdel Aziz M. Successful Delivery of Public- Private Partnerships for Infrastructure Development [J]. ASCE: Journal of Construction Engineering and Management, 2007,133:12(918).
  • 8Jingfeng Yuan, Yajun Zeng, Miroslaw J. Skibniewski, Qiming Li: Selection of Performance Objectives and Key Performance Indicators in Public Private Partnership Projects to Achieve Value for Money[J]. Construction Management and Economics, 27 (3) :253-270.
  • 9Li B, Akintoye A, Edwards P J, Hardcastle C. Critical success factors for PPP/PFI projects in the UK construction industry [J]. Construction Management and Economics, 2005, 23: 459 - 471.
  • 10Salman A F M, Skibniewski M J, Basha I. BOT Viability Model for Large--Scale Infrastructure Projects [J]. ASCE: Journal of Construction Engineering and Management, 2007, 133(1): 50-63.

共引文献111

同被引文献176

引证文献26

二级引证文献74

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部