摘要
通过对昆明西站东咽喉的既有交叉渡线施工方案进行简单阐述,针对资源配备、施工方法及步骤、安全质量及应急等方面进行了具体分析说明,保证工程施工具有安全可靠性,为工程施工质量提供保障,旨在为类似工程提供借鉴。
This article through to the Kun Ming West Railway Station East throat is crosstransmitting line construction scheme is briefly introduced,according to the resources,construction methods and steps,the quality of safety and emergency and other aspects of the specific analysis,to ensure the safety and reliability of engineering construction,to provide protection for the construction quality,in order to provide reference for similar engineering.