昆明西站既有交叉渡线整组纵移工法

Kunming West Railway Station Cross Line Crossing the Whole Set of Longitudinal Shift Method
下载PDF
导出
摘要 通过对昆明西站东咽喉的既有交叉渡线施工方案进行简单阐述,针对资源配备、施工方法及步骤、安全质量及应急等方面进行了具体分析说明,保证工程施工具有安全可靠性,为工程施工质量提供保障,旨在为类似工程提供借鉴。 This article through to the Kun Ming West Railway Station East throat is crosstransmitting line construction scheme is briefly introduced,according to the resources,construction methods and steps,the quality of safety and emergency and other aspects of the specific analysis,to ensure the safety and reliability of engineering construction,to provide protection for the construction quality,in order to provide reference for similar engineering.
作者 张勇 ZHANG Yong(The Construction of LuqiaoRailwayGroupCo.Ltd.,Jinzhong 030600,Chin)
出处 《工程建设与设计》 2017年第3期158-160,共3页 Construction & Design for Engineering
关键词 既有交渡 应急措施 昆明西站 交叉渡线 existing cross emergency measures Kunming west railway station cross line
  • 相关文献

参考文献3

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部