摘要
对白音华三号矿首采区境界及推进方向的2种方案进行可行性比较,并从资源高效利用、高效发挥半连续系统效率等角度,确定实施方案,保证露天矿接续。
This article compares two schemes of boundary promotion direction in the first mining area of Baiyinhua No. 3 Mine. From the efficient use of resources, effectively developing semi continuous system efficiency aspects, the mine determines the implementation plan to guarantee the normal development of the open-pit mine.
作者
朱宴南
张立华
赵健
ZHU Yannan ZHANG Lihua ZHAO Jian(SPIC Mengdong Energy Group Co.,Ltd., Tongliao 026200, Chin)
出处
《露天采矿技术》
CAS
2017年第1期9-11,共3页
Opencast Mining Technology
关键词
露天矿
首采区
推进方向
优化
半连续系统
open-pit mine
first mining area
promotion direction
optimization
semi continuous system