摘要
文章简述了中国工程公司在斯里兰卡某罐区项目中设计和施工阶段所遇到的一些问题,包括材料采购,质量管理,施工条件,和现场特殊环境限制等。通过对这些问题的深入分析得出了国外工程建设项目质量管理工作中所需要注意的各项问题及对策。
The paper presents some problems encountered in the design and construction phases of a Chinese tank project in Sri Lanka, including materials procurement, quality management, construction conditions, and site specific environmental constraints. Through the in-depth analysis of these problems, the paper points out the problems and countemleasures in the quality management of foreign engineering construction projects.
出处
《广东化工》
CAS
2017年第2期100-101,共2页
Guangdong Chemical Industry
关键词
国外现场
质量管理
采购
施工
foreign site: quality management: procurement: construction