摘要
软土路基承载力小,含水量大,不能满足施工需要,需采取有效的技术措施进行处理。文章结合工程实例,探讨强夯置换法在软基处理中的应用,并提出具体的施工对策。
The soft soil foundation has small bearing capacity and high water content,which can not satisfy the construction need,thus it requires the treatment by effective technical measures.Combined with engineering example, this article discussed the application of dynamic compaction replacement method in soft foundation treatment, and proposed the specific construction countermeasures.
出处
《西部交通科技》
2017年第1期25-27,共3页
Western China Communications Science & Technology
关键词
强夯置换法
软土地基
试夯施工
强夯施工
Dynamic compaction replacement method
Soft soil foundation
Test compaction construction
Dynamic compaction construction