摘要
论述了一种满足接触网弹性吊索无调整安装时测定弹性吊索初张力的方法,以及接触网弹性吊索无调整安装技术在2条高速铁路接触网施工中的应用效果。
The paper illustrates a method for measurement of preliminary tension of elastic stitch wire which meets the requirements for non-adjustment installation of elastic stitch wire of overhead contact system,and presents application results of the technology on construction of overhead contact systems of 2 high speed railways.
出处
《电气化铁道》
2017年第1期34-36,共3页
Electric Railway
关键词
弹性吊索安装
无调整
技术
Elastic stitch wire installation
non-adjustment
technology