期刊文献+

BESⅢ ETOF upgrade readout electronics commissioning

BESⅢ ETOF upgrade readout electronics commissioning
原文传递
导出
摘要 It is proposed to upgrade the endcap time-of-flight(ETOF) of the Beijing Spectrometer Ⅲ(BESⅢ) with a multi-gap resistive plate chamber(MRPC), aiming at an overall time resolution of about 80 ps. After completing the entire readout electronics system, some experiments, such as heat radiation, radiation hardness and large-current beam tests, have been carried out to confirm the reliability and stability of the readout electronics. An on-detector test of the readout electronics has also been performed with the beam at the BEPCⅡ E3 line. The test results indicate that the readout electronics system fulfills its design requirements. It is proposed to upgrade the endcap time-of-flight(ETOF) of the Beijing Spectrometer Ⅲ(BESⅢ) with a multi-gap resistive plate chamber(MRPC), aiming at an overall time resolution of about 80 ps. After completing the entire readout electronics system, some experiments, such as heat radiation, radiation hardness and large-current beam tests, have been carried out to confirm the reliability and stability of the readout electronics. An on-detector test of the readout electronics has also been performed with the beam at the BEPCⅡ E3 line. The test results indicate that the readout electronics system fulfills its design requirements.
出处 《Chinese Physics C》 SCIE CAS CSCD 2017年第1期156-161,共6页 中国物理C(英文版)
基金 Supported by Chinese Academy of Sciences(1G201331231172010)
关键词 BESⅢ upgrade of endcap TOF FEE the readout electronics system MRPC BESⅢ upgrade of endcap TOF FEE the readout electronics system MRPC
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部