期刊文献+

综合改造提高选煤厂装车效率

Comprehensive Improvement on Loading Efficiency of Coal Preparation Plant
下载PDF
导出
摘要 阳煤五矿选煤厂为保障车站货运安全,降低装车延时费用,采取装车簸箕加设行程开关及铁链挂钩方式增加安全性,四五道启动液压系统由单一启动方式改造为电脑、手动启动方式,装车风管加设排水装置等技术改造,提高了选煤厂的综合装车效率。 In order to guarantee the coal preparation plant of freight station safety and reduce loading delay costs, and takes measures of loading added travel switch and the chain hook way to increase security, the four or five launch of the hydraulic system by a single start mode for the transformation of computer, manual mode, loading wind pipe set drainage device and technology transformation, comprehensively improve the loading efficiency of coal preparation plant.
作者 郭月鹏
出处 《机械管理开发》 2017年第1期98-99,共2页 Mechanical Management and Development
关键词 综合改造 选煤厂 装车效率 comprehensive transformation coal preparation plant loading efficiency
  • 相关文献

参考文献2

二级参考文献4

  • 1任文芳.司马矿选煤厂选煤工艺设计与布置创新[J].煤炭工程,2006,38(9):13-14. 被引量:4
  • 2徐灏.机械设计手册(第五卷)[M].北京:机械工业出版社,1994:61~93,261~305.
  • 3路甬祥.液压气压技术手册[M].北京:机械工业出版社,2004:227.
  • 4GB 50359-2005.煤炭洗选工程设计规范[S]..2005

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部