工程赶工费用索赔处理的实践与探讨 被引量:4

Practice and Discussion of Dealing with Claiming for Cost of Crashed Task
下载PDF
导出
摘要 阐述工程赶工索赔及处理原则,研究处理赶工降效费用的实物量总费用法和单价补差法,介绍水电工程赶工费处理案例,并从发包人视角提出工程赶工费用索赔预防和规避策略及建议。 Analyzes the calculation principle and pattern of cost of crashed task,studies the total cost method of physical quantity and compension method of unit price that dealing with cost of crashed task due to effi ciency decrease,introduces the practice case that dealing with claiming for cost of construction accelerative of waterpower engineering,puts forward the comprehensive processing strategy and suggestion that can prevent and avoid the claiming for cost of crashed task from the view of developer.
作者 马玉峰 吴天宇 任军霞 李会来 MA Yufeng WU Tianyu REN Junxia LI Huilai(Beijing ZhongTianHengDa Co., Ltd, Beijing 100081, China)
出处 《建筑经济》 2017年第2期40-43,共4页 Construction Economy
关键词 赶工费用 索赔 降效 合同管理 cost of crashed task claim effi ciency decrease contract management
  • 相关文献

参考文献4

二级参考文献9

共引文献15

同被引文献15

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部