摘要
本文结合山西省长治地区的A矿进行实例分析,根据导水裂隙带的形成原因及其影响因素,确定采用井下仰孔双端封堵测漏法进行观测。根据观测结果数据的分析,确定了导水裂隙带的高度及采裂比,并根据此最终给出了防水安全煤(岩)柱厚度计算值。
Combined with A mine of shanxi changzhi area and according to the forming causes and influence factors of water flowing fractured zone, the leak detection method of underground upward hole with two plugging is confirmed. In the light of the data analysis results, the height of water flowing fractured zone and fissure ratio is determined, and the pillar thickness calculate value of coal(rock) is also proposed.
出处
《煤矿现代化》
2017年第2期9-10,13,共3页
Coal Mine Modernization
关键词
导水裂隙带
综放开采
观测方法
防水煤(岩)柱厚度
Water Flowing Fractured Zone
Fully Mechanized Top Coal Caving Mining
Observation Method
Waterproof Coal(rock)Pillar Thickness