期刊文献+

Civil 3D在某项目平基土石方精确算量的应用 被引量:10

The Application of the Civil 3D in the Accurate Calculation of Leveling Earthwork
下载PDF
导出
摘要 以重庆某高校教职工经适房项目平基土石方工程为例,介绍了civil 3d在土石方精确算量的应用,特别是对复杂场地如何创建设计曲面、如何准确的放坡等作了详细的介绍;制作的平基土石方三维效果图及挖填方工程量为甲乙双方平基土石方工程结算提供了依据。 Taking as an example, the flat base condition work of an affordable housing project of a university in Chongqing, this paper introduces the application of civil 3d in accurate calculation of earthwork quantity, particularly how to create curve design in complex situations and how to do slope-excavation. As a result, the 3 D effect drawings of the Flat-Earth Work and dig-fill quantities of the Earth Work, supply party A and party B with theoretical foundation for computing project's outlay.
作者 陆龙坤 徐宁 Lu Longkun Xu Ning(Chongqing University, Chongqing 400044, China Chongqing University of Posts and Telecommunications, Chongqing 400065, China)
出处 《土木建筑工程信息技术》 2016年第6期60-63,共4页 Journal of Information Technology in Civil Engineering and Architecture
关键词 土石方量 AUTODESK CIVIL 3D 曲面 Quantity of Earthwork Autodesk Civil 3D Curved Surface
  • 相关文献

参考文献3

二级参考文献7

共引文献37

同被引文献63

引证文献10

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部