摘要
针对某核电站核岛通风空调系统现场施工安装过程中出现的问题,从问题产生的原因和通风空调系统的主要组成部分2个方面分别对现场澄清单进行分类统计,得到并分析现场常见问题,并提出了解决方案。
Mainly focuses on the field construction and installation problems of HVAC system in EPR nuclear power project. According to the causes of the problem and the main components of the HVAC system, carries out classification statistics of the clarification request. Analyses the common problems and puts forward the solutions.
出处
《暖通空调》
北大核心
2017年第2期21-25,共5页
Heating Ventilating & Air Conditioning
关键词
通风空调系统
施工安装
分类统计
问题分析
解决方案
HVAC, construction and installation, classification statistics, problem analysis, solution