摘要
根据永和水电站水库右岸单薄山梁的地层结构、地质条件,结合勘察资料对右岸单薄山梁段进行分段渗漏情况分析,并估算渗漏量,提出处理建议。
According to the strata structure and geological conditions in the thin mountain ridge on the reservoir's right bank of Yonghe Hydropower Station, and in combination with the exploration data,the paper analyzes the leakage situation of every section in the thin mountain ridge, estimates the total leakage amount and presents some reasonable suggestions.
出处
《山西水利科技》
2017年第1期34-35,41,共3页
Shanxi Hydrotechnics
关键词
坝基
坝肩
工程地质
dam foundation
dam abutment
engineering geology