期刊文献+

基于微观交通仿真的枢纽互通建设交通组织方案实例研究 被引量:7

Research on Traffic Organization Scheme of Hub Interchange Based on Microscopic Traffic Simulation
原文传递
导出
摘要 高速公路施工区交通系统本身具有其复杂性和特殊性,尤其是枢纽互通区域由于场地大、跨线桥多,交通组织更加复杂,采用现场试验的方法往往由于人力、物力和财力以及其他条件的限制,导致缺乏足够的样本而难以得出信服的结论。以京港澳高速京石段彭家庄枢纽互通实例作为研究对象,结合我国高速公路养护施工区实际情况,将微观交通仿真技术引入高速公路施工区交通系统的研究。通过微观仿真方法,对京港澳高速京石段彭家庄枢纽互通的三种施工组织方案实施评估,实现了施工组织的优化,避免了改扩建施工期间带来交通拥堵,节省了施工经费,高效地完成了改扩建交通组织的实施,具有重要的实际应用和推广价值。 The traffic system in expressway work zone has its complexity and particularity, especially in hub interchange area due to the large site scale, multiple overpasses, the traffic organization is much more complicated, hence it is usually difficult to draw convincing conclusions by field tests due to constraints on human, material and financial resources and other conditions, as well as due to lack of enough samples. In this paper taking the Pengjiazhuang Interchange on Beijing-Shijiazhuang section of Beijing-Hong Kong-Macao Expressway as the research object, combining with the actual situation of highway maintenance area, microscopic traffic simulation technology is introduced to study the traffic system in expressway construction area. Through the micro simulation method three construction organization plans for Pengjiazhuang Interchange is evaluated, construction organization optimization is realized, which has avoided traffic congestion during the expansion construction period, saved construction cost, and effectively completed the traffic organization of upgrading project, with essential value for practice and application.
作者 贾献卓
出处 《公路》 北大核心 2017年第2期153-159,共7页 Highway
关键词 高速公路 施工区交通组织 微观交通仿真 expressway traffic organization in construction area microscopic traffic simulation
  • 相关文献

参考文献5

二级参考文献22

  • 1岳军委.洛三高速公路改扩建工程交通组织方案研究[J].中外公路,2010,30(6):257-260. 被引量:14
  • 2张翛,蔡晓禹,孙立军.高速公路作业区交通流的运动学波分析[J].公路交通科技,2007,24(3):98-101. 被引量:10
  • 3Serge P.Hoogendoorn,Piet H.L.Bovy.State-of-the-art of Vehicular Traffic Flow Modeling.Special Issue on Road Traffic Modelling and Control [J].Journal of Systems and Control Engineering,2000.
  • 4Q.Yang.A Simulation Laboratory for Dynamic Traffic Management Systems [D].PhD thesis,Massachusetts Inst.of Tech.,Cambridge,MA,1997.
  • 5DudekC L,S H Richards.Traffic capacity through urban freeway work zones in Texas[J].Transportation Research Record,1982,869.
  • 6JIANG Yi.Traffic capacity,speed and queue——discharge rate of indiana's four-lane freeway work zones[J].Transportation Research Record,1999,1657.
  • 7Robert I Carr.Construction congestion cost (CO3) basic model[J].Journal of construction engineering and management,2000,126(2).
  • 8Paul Schonfeld,Steven Chen.Optimal work zone lengths for two-lane highways[J].Journal of Transportation Engineering,1999,125(1).
  • 9Xiaomo Jiang,Hojjat Adeli.Freeway work zone traffic delay and coat optimization model[J].Journal of Transportation Engineering,2003,129(3).
  • 10COSIM User's Manual[S].Washington,D.C.:FHWA,2006,10.

共引文献128

同被引文献43

引证文献7

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部